Comparing Delivery Methods: Risk, Schedule, Cost, and Contractual Relationships
A side-by-side comparison of the four primary project delivery methods (Design-Bid-Build, CM at-Risk, Design-Build, and Integrated Project Delivery) across five dimensions: risk distribution, schedule characteristics, cost certainty, contractual structure, and collaboration level.
Why Delivery Method Comparisons Matter on the ARE
Every construction project starts with a decision that shapes everything downstream: how will this project be delivered? That choice determines who carries the risk, how fast the schedule moves, how much cost certainty the owner gets, and how the contracts connect the parties together.
The ARE expects you to compare four primary delivery methods across these dimensions. Design-Bid-Build (DBB) is the traditional sequential approach. Construction Management at-Risk (CMAR) brings the constructor in early while keeping design and construction contracts separate. Design-Build (DB) puts design and construction under one entity. Integrated Project Delivery (IPD) binds owner, designer, and constructor together through a multi-party agreement with shared risk and reward.
No single method works for every project. The right choice depends on the owner's risk tolerance, schedule pressure, need for cost certainty, and desire for collaboration. An owner comfortable absorbing more risk might choose IPD for the potential of better outcomes. An owner who wants maximum price competition might stick with DBB.
This topic walks through each method across five comparison dimensions. You need to understand not just what each method is, but when one outperforms another and why. Exam questions will put you in scenarios where you must recommend a delivery method or identify how risk shifts between parties depending on the structure chosen.